Termite treatment quote comparison worksheet
Use this worksheet to compare termite treatment bids against the same scope, assumptions, and project conditions.
Keep every bid on the same assumptions
Start with the same project description, cost drivers, expected materials, access notes, and timeline for each contractor. The biggest drivers for this project are home size, termite type, treatment method, and infestation scope.
Project supplies
Price-check related tools, parts, fixtures, filters, safety items, and materials before you buy or review a bid.
View full supply checklistProducts that may support this project
Related supplies
Use these links to check common product categories, then confirm what your contractor includes.
Product links may earn GetCosts.com a commission from qualifying purchases.
Scope comparison
| Assumption | Question to ask | Bid 1 notes | Bid 2 notes | Bid 3 notes |
|---|---|---|---|---|
| Project scope | What is included in each termite treatment bid, and what would be billed separately? | |||
| Home size | How does each contractor account for home size? | |||
| Termite type | How does each contractor account for termite type? | |||
| Treatment method | How does each contractor account for treatment method? | |||
| Infestation scope | How does each contractor account for infestation scope? |
Bid terms to compare
| Bid item | What to compare | Bid 1 notes | Bid 2 notes | Bid 3 notes |
|---|---|---|---|---|
| Included work | Labor, standard materials, preparation, cleanup, and disposal included in the price. | |||
| Allowances and exclusions | Items priced as allowances, excluded work, or conditions that could change the final price. | |||
| Permits and code work | Permit handling, inspection requirements, code upgrades, and who pays for surprises. | |||
| Schedule and payment terms | Start date, timeline, deposit, progress payments, final payment, and cancellation terms. | |||
| Warranty and cleanup | Labor warranty, material warranty, site protection, cleanup, and haul-off responsibilities. |
Before you choose a contractor
Ask each contractor to price the same scope, materials, cleanup, warranty, and change-order rules. A low bid is only useful when you know what is included and what can change later.
Quote comparison FAQ
How should I use a termite treatment quote comparison worksheet?
Use the worksheet after reviewing the $500 - $3,500 per treatment planning range. Ask each contractor to price the same scope, then compare notes on home size, termite type, treatment method, and infestation scope. Review included work, allowances, permits, schedule, payment terms, warranty, and cleanup before choosing a bid.
What should stay the same across termite treatment bids?
Keep the project description, home size, termite type, treatment method, timing, site access, materials, cleanup, warranty, and change-order assumptions as consistent as possible. Bids are easier to compare when each contractor is responding to the same conditions.
What should I ask before comparing termite treatment quotes?
Ask what is included, what is excluded, and which conditions could change the price. For this worksheet, pay close attention to included work, allowances and exclusions, permits and code work, schedule and payment terms. Those items often explain why one bid is lower or higher than another.
Is this termite treatment worksheet a contractor quote?
No. This worksheet is a planning and bid-comparison tool for organizing contractor estimates. It does not collect contact details, route a lead, promise contractor availability, or guarantee an exact final price.